The restoration of Boston & Maine #3713 at the Steamtown National Historic Site in Scranton, PA has been moving along despite the challenges presented by the pandemic. The Steamtown shop crew was able to safely move the restoration froward, working within the rules set as part of the National Park Service pandemic response. Although 2020 presented many challenges, work continued to bring the steam locomotive – a classic example of American engineering – back to working order after its retirement almost 70 years ago.
In the months leading up to 2020, the focus was on major parts of the locomotive. The refurbished drivers, brand new tender cistern, newly fabricated cab and other large items all had their turn in the spotlight. The realities of the pandemic saw the Steamtown team focus on smaller assemblies essential to returning the locomotive to order, with one big exception as you will see…







The bulk of the tender consists of the coal bunker and water tank. The assembly is commonly called the cistern. #3713’s cistern required full replacement. An exact replica was built by Oaks Welding of Ashland, PA. The cistern can’t be positioned on the tender until the trucks, brake rigging, stoker and the frame itself are inspected and repaired. This work was able to proceed during 2020.
The foundation of the tender is a steel frame similar to that found under freight cars. The top of the frame is covered with wood decking upon which the cistern sits, while the bottom carries the brake equipment and center plates that keep the trucks in place. In this image, the frame is turned upside down, allowing the shop crew to work on all the components without having to crawl underneath. Before reaching this phase of restoration, the heavy frame was given the same thorough cleaning, inspection and repair as the rest of the project.














Please keep checking this site or https://www.facebook.com/Project3713/ for more updates as the restoration proceeds.